Concrete curing time
What is the concrete curing time? How long should be the curing be applied to the concrete after construction.
Time frame for curing of concrete is around 7-24days, but minimum of 7 days. After concrete is placed, the concrete increases in strength very quickly for a period of 3-7 days. Concrete which is cured for 7 days is about 50% stronger than uncured concrete.